“The high standards required by D. Masoutis S.A. throughout our operations demanded the construction of an industrial floor of the highest quality. The technical solution offered by the main contractor VERMION S.A. and executed by EUROLIT INDUSTRIAL FLOORING in co-operation with CONCRETE GRINDING LTD fully justified our choice.
The Laser Grinding process did not interfere at any time with other ongoing works. We had a very strict programme and the whole floor construction and grinding process was completed according to schedule and without any deviation. It also proved cost effective; as the floor was laid to a high standard, Concrete Grinding Ltd identified areas within the aisles that already complied with the specification, meaning the amount of grinding was minimised.
As a result, the operation of our VNA trucks within the 107 aisles totalling more than 4,500 linear metres of our 50,000 sq. m facility is flawless. The trucks operate effortlessly and efficiently at the maximum speed specified by Linde Materials Handling of 9 km/h, even with the operator cabin located at the maximum height.
We are extremely pleased with the overall results and highly recommend Eurolit Industrial Flooring and Concrete Grinding Ltd.”
Chairman of the Board, D. Masoutis S.A
For a site visit or advice on the best solution, contact the experts.
"Your guys, Scott and Leon, performed their work very well...."
Senior ManagerLeading Tyre & Rubber Product Company
"The floor surfaces in our buildings were not sufficiently flat..."
Construction DepartmentVSM AG
"I wanted to write and praise your team that have..."
General ManagerNisbets Australia Pty Ltd